2012 Proposed Budget


Posted by rfay

2012 Proposed Budget Detail
 
 
 
 
 
 
 
.
 
2012 Proposed
2011 Budgeted
2011 Actual (11/19/2011)
Notes
.
Landscape Maintenance
$16,274
$17,500
$16,762
 
.
Landscape Replacement and planning
$1,000
$500
$0
Includes $500 for a xeriscaping plan
.
Pond Dredging
$0
$1,000
$696
 
.
Pump aerator/upgrades
$1,500
$1,000
$1,194
Rebuild pump and motor in winter. Pump man estimate is about $1035 (11/30/2011). This does not include other upgrades; should it be higher?
.
Irrigation Upkeep (Ed Stehlin)
$1,709
$1,500
$1,628
 
.
Irrigation Repair (Pump Man)
$500
$500
$1,239
 
.
Sidewalk Repair
$1,000
$1,000
$0
 
.
Contingency Fund
$1,000
$1,000
$2,400
 
.
Utilities
$1,600
$1,300
$1,550
 
.
Office Supplies
$500
$110
$155
Includes $300 for quickbooks
.
Postage
$250
$170
$200
 
.
Liability Insurance
$1,800
$1,800
$2,019
 
.
Reserve Fund
$6,220
$6,220
$5,800
This 5K was not just for this year but last also
.
 
 
 
 
 
.
Total Outgo
$33,353
$33,600
$33,643
 
.
Income
$33,600
$33,600
23885
 
.
End of year reserve fund balance
$19,020
 
$12800