Documents


Posted by rfay

This page should be maintained to show current larger items that should be added to future budgets.

Updated 2020-07-01

Unbudgeted items

Posted by rfay

As always, our liability insurance is paid up. Posted here.

Document: 
AttachmentSize
PDF icon State Farm Pol Montclair 19-20.pdf172.04 KB
Posted by rfay

Stucco for the Montclair HOA is "El Raj Stucco, Perira Flex Acrylic Stucco Finish". A 05 2107 403 OPR Med White Base TR827

Posted by rfay

One of the purposes of an HOA is to provide consistent colors, architecture, and maintenance.

This page is used to attempt to catalog colors required for use in our neighborhood.

Fascia, soffit, and related stain is Cabot Austrailian Timber Oil, "Mahogany Flame".

UPC 080351810077 Information

Posted by rfay

To Members of the Montclair HOA Board December 07, 2017

The following is a timeline and synopsis of events regarding the repair of the Montclair Subdivision irrigation main:

October 5, 2017
At 5:09 PM Ray Musser sent out an e-mail notifying the Board and Will at WD Yards that there was a leak at the northeast corner of 805 Montclair Drive and that he had shut off the irrigation main valve and the pump.

Document: 
AttachmentSize
File Irrigation Repair Synopsis.docx14.62 KB

2016 HOA Registration

26 Jun 2016
Posted by rfay

This document shows the Montclair HOA Licensing with the state from June 2016 to June 2017.

Posted by rfay

Full contract is attached.

Document: 

9-8-2015 P&L

28 Sep 2015
Posted by thawkx4
Document: 
AttachmentSize
PDF icon 9-8-2015 Balance Sheet33.47 KB
PDF icon 9-8-15 Balance Sheet.pdf33.7 KB

2015 Approved Budget

23 Jan 2015
Posted by rfay

 The 2015 Approved Budget is at link.

Pages